Hakobi

Structured Cabling in Sabah

Last reviewed: 31 August 2026

Structured cabling covers the physical fibre and copper backbone that everything else — network, VoIP, Wi-Fi access points — depends on, installed to spec and documented rather than run ad hoc as needs arise.

The problem

Cabling that’s added incrementally over years, without a plan, becomes the hardest thing to troubleshoot in a network — nobody knows which cable goes where, runs aren’t labeled, and there’s no test data proving a given link meets spec.

What’s included

  • Site survey and cable pathway planning
  • Fibre and copper cable installation
  • Termination, labeling and testing
  • As-built documentation
  • Cable certification against relevant standards

How we deliver

Installations are scheduled to minimize disruption to occupied sites, with phased work around business hours where needed. Every completed run is tested and documented before project close-out.

Who this is for

New office fit-outs, hotel and hospitality builds, industrial and port sites needing structured cabling to support network and communications infrastructure.

What it costs

Cost depends on drop count, cable run length and site conditions, so pricing is confirmed after a site survey rather than quoted upfront. Request a quote and we’ll scope it from there.

Technology we use

Proof

Case study

Cold-storage structured cabling and Wi-Fi network for a Sabah logistics company

Structured cabling and outdoor-rated access point deployment inside a -30°C cold room for a Sabah cold-chain logistics company, lifting in-room Wi-Fi speeds from under 10Mbps to around 400Mbps.

Frequently asked questions

Do you handle both fibre and copper cabling?

Yes — the right choice depends on distance, bandwidth requirements and site conditions, assessed during the site survey.

Will we get documentation after the install?

Yes, every installation is documented — cable runs, labeling, and test results are handed over as part of project close-out.

Can cabling be installed in an occupied building without disrupting operations?

Yes, phased installation around business hours is standard for occupied sites like hotels and offices.

Do you certify and test cable runs?

Every run is tested and certified against the relevant standard before handover.

Ready to talk to an engineer?

Tell us about your site, your network, or your compliance deadline. We'll respond within one business hour.